The fire continues to burn and get larger by the day. It is now almost 40,000 Ha in size. Recently a windy day helped it to jump the containment lines that were so painstakingly prepared. It has jumped the lines in the North, East and West however, there remains a huge effort in place to get this monster contained in time and finally out. Yesterday the low thump, thump thump of distant choppers could be heard all day. It sounded like a distant thunderstorm that never arrived, always in the distance.
In order to do my bit to help with this fire I decided to roll out a seriously powerful rain attracting device (SPRAD).
For it to work correctly a few things need to happen.;)
Firstly Weatherman Graham Creed on the ABC news needs to say something along the lines of "sadly there is no rain predicted in the foreseeable future with at least a week of predicted sunny days ahead".
Secondly the ground needs to be baked dry and hard as stone.
Once I saw these preconditions I needed to get to work on the SPRAD.
This involves the use of tools such as pick, iron bar and trenching shovel.
To dig any holes in the sandstone and ironstone country requires a serious commitment in time and sweat.
I got to work digging the SPRAD and once I was past the point of no return.... the rain forecast changed!
Next there is a mad rush to get the services in the open trench before the rain starts.Will I get everything in place and the trench filled before the rain? Lets wait and see.
Every single time we have had an open trench during our building project it has eventually rained, quite often it has poured. In the past I have enlisted the DW to bounce up and down on the conduit in a rain and mud filled trench while I madly back fill to keep the cable and conduit from floating to the surface. Surely the wildlife were laughing at our frantic attempts.
The last trench which carried the gas line received a downpour and it funneled rain water under the house only a week before I was to start laying the floor boards! It was 300mm deep in place!
 |
| part of the trench |
The SPRAD otherwise known by the boring term of "trench" is really to take the remaining
services to the house. Including the electricity cables which I have buried around 700mm deep. The water pipe goes on top of that at about 600mm deep. Because this trench is over 16m long in sandstone country it is a huge effort to dig by hand. So when ever a trench is open I place a few extra conduits in it for future proofing in case I need to add anything else.
Hopefully very soon we will have working lights and power points.Now that will be nice.